Introduction
In most electricity markets, missing your forecast has a price. Imbalance charges, tolerance bands and dispatch obligations set it, and the rules differ by market. Part of the miss can sit in how the model represents your plant, and your own generation record can correct that part. This guide shows which errors it can fix, which it can’t, and how to prepare the data.
A forecast miss builds up along a chain of four stages: the weather forecast, the conversion to irradiance at your site, the plant’s response to that irradiance, and the plant’s operating state on the day. Your generation data informs the last two most directly, because those stages describe the plant. With high enough quality, and used in training, it can also correct persistent bias in the weather inputs at a site. Figure 1 shows the four stages and where the data acts on them.
Where forecast error enters
Site measurements improve the plant-specific stages directly, helping the forecast better represent conversion to power and operating state.
.png)
In this guide “site measurements” means the generation data most operators already hold: metered generation, with availability and curtailment records. Both methods described here, tuning and training, use it as their reference, because it records what the plant delivered. Irradiance measurements from on-site sensors are not part of either method. We also don’t use customer-provided irradiance measurements to adjust or retrain Solcast’s irradiance forecasts.
An operating plant also differs from its specification sheet. Its clipping threshold is set by the DC/AC ratio and inverter rating as built. Its shading includes obstructions the layout design may not capture. Its soiling follows local conditions and the cleaning regime in place. Its generation record reflects all of these.
DNV’s forecasting team has run operational wind and solar forecasts for decades, across more than 20 countries, and was selected as New Zealand’s national forecasting benchmark. This guide draws on those experiences.
1. What site measurements can and cannot fix
Metered generation teaches a model how your plant converts a given set of conditions into output. It does not correct the day-to-day error in the weather forecast those conditions come from. Knowing where that boundary falls sets realistic expectations before you invest in tuning or training.
What it does capture is how much that conversion differs from one plant to another. Two systems under identical irradiance can produce differently shaped output profiles, as Figure 2 shows.
.png)
One system faces 15° west of due south at 30° tilt, the other 25° east of due south at 40°. The system facing west of south carries its output further into the afternoon; the one facing east of south peaks earlier. Because the irradiance is identical, the difference comes from orientation and tilt alone.
An operating plant has many more characteristics of this kind than azimuth and tilt, and some are not recorded in its design documentation. Site measurements capture their combined effect.
What measurements are good at
- Clipping at the as-built threshold. The generation record shows the output level at which the plant clips, and how often and for how long. Clipping is most frequent on clear, cold days with high irradiance, when module output can exceed its rating at standard test conditions.
- Shading outside the design model. Row-to-row shading can be calculated. A tree line, a substation, an adjacent building or a ridge on the eastern horizon is often not in the design model, and the shading each casts changes with the sun’s path through the year. The generation record has captured that effect since commissioning.
- Soiling as it varies at the site. Design and energy-yield tools commonly represent soiling as a fixed loss, set for the year or month by month. The generation record shows how it changes over time: accumulation between cleanings, recovery at each cleaning and after rainfall, and seasonal patterns such as dry-season dust.
- Thermal behaviour that differs from design assumptions. Datasheet temperature coefficients are measured under laboratory conditions. Operating cell temperature depends on mounting, ventilation, wind and ambient temperature at the site, and measured output reflects all of these.
- Systematic bias. A model that runs consistently high or low, overall or under particular conditions such as low sun angles. A consistent offset is visible only against measured output, and it is what tuning removed at the 42 MW plant described in section 3.
- Persistent underperformance. A string offline for an extended period, a tracker row that stopped rotating, degradation running faster than the assumed rate.
What measurements cannot fix
- They do not anticipate weather. The generation record describes plant output after it has occurred. It contains no information about cloud approaching the site, which satellite cloud tracking observes in advance.
- Neither tuning nor training corrects a wrong weather forecast. They improve how the model converts weather into power, so if tomorrow’s weather forecast is wrong, the power forecast will be too. Over a longer record, training can also correct persistent bias in the weather inputs at a site. Using live measurements to adjust the first hours of a forecast is a separate mechanism, covered in section 4.2.
- They do not describe the plant after a material change. Repowering, a capacity change, a module replacement or a long derated period all mean part of your history describes something else.
- They do not remove uncertainty. They bring the forecast closer to the plant’s actual operating behaviour. Weather uncertainty remains, and section 5 describes how a probabilistic forecast expresses it.
Measurements therefore deliver most value at operating plants with an established generation history and a measurable cost of forecast error. For a plant not yet commissioned, start with a physical model and add measurements when you have them.
2. Getting the data right before you model anything
A PV plant’s meter records output driven by the weather. It also records every outage, maintenance window, inverter trip, communications dropout, meter reset and curtailment instruction. A model trained without those events identified learns them as plant behaviour.
Operating records commonly contain some of these events, but the events are often not flagged alongside the power measurements. Identifying them is a substantial part of preparing a training set. The work needs context and judgement, which is why it cannot be fully automated: deciding whether a 30-minute drop in output around midday was passing cloud, an inverter trip or a scheduled test is not a question the data answers on its own.
What to check in your data before it is used for training
These issues are typical of operating data. Each problem needs to be found before training rather than after.
2.1 The curtailment problem
Curtailment needs separate treatment. An unflagged curtailed record used in the training dataset can produce a model that matches its training data but under-forecasts in operation. It is also a question operators raise with us regularly, usually in similar terms: the plant has been heavily curtailed, so its real potential is unknown; all that has been recorded is output after curtailment.
The meter records what the plant was permitted to produce. A model needs to learn what it could have produced, and only the first is in the generation record.
.png)
In this example, measured generation reaches the 8 MW curtailment limit and remains there through part of the day. The generation record shows the power the plant was permitted to produce, but not how much it could have produced without the constraint.
This matters when the data is used for model training. Premium PV Power uses historical production alongside irradiance and weather data to learn site-specific plant behaviour. If curtailed periods are not identified, the model can treat constrained output as normal plant behaviour, contributing to under-forecasting when the plant is unconstrained.
The important step is therefore to identify curtailed intervals and decide how they should be handled before training.
Questions to settle before training
Before supplying historical measurements for training, establish how curtailment will be identified and treated:
- What happens to a curtailed interval? Is it excluded, reconstructed or modelled as a known constraint?
- How is curtailment identified if it is not explicitly flagged? Can it be distinguished from equipment limitations, outages or other causes of reduced production?
If curtailment cannot be identified reliably, agree how affected intervals will be handled before the model is trained.
2.2 Telling the forecast what the plant is allowed to do
Training data addresses the historical record. A live forecast also needs to reflect constraints already known in advance.
A forecast that does not reflect a planned outage or an active curtailment ceiling produces a schedule the plant cannot deliver, and where imbalance settlement applies, the difference is charged. The same applies to the most recent measurements feeding a short-term forecast. If those reflect a restriction rather than the plant’s potential, the forecast is reduced accordingly.
All three Solcast PV models can reflect plant condition, at different levels of control:
Characteristics that persist, such as long-term shading, are properties of the site and belong in the model. Short-lived events, such as a missed cleaning or a three-day outage, should be excluded from what the model learns as normal operation.
3. How measurements enter a PV model
This guide distinguishes two methods. They differ in what they change and in who carries out the work.
Tuning adjusts a model you have configured. You describe your plant, the model produces a forecast from that description, and measurements correct the description and then the residual error. The model stays a physical model. Measurements make it a better-calibrated one.
Training builds a model of your plant’s behaviour from the measurements themselves, anchored to the weather conditions that produced them. The physical description becomes a starting point rather than the whole answer.
Both methods benefit from a full year of generation history, which captures a complete seasonal cycle. Advanced PV can be tuned with a minimum of six months, while one year is recommended; Premium PV training generally uses at least one year. Either is a valid choice, and the right answer depends on your data, your exposure and how much of this work you want to own.
3.1 Tuning a physical model
The Advanced PV Power model is a physical model of intermediate complexity that can be empirically refined.
- Physical means you specify your plant's actual characteristics and get a forecast without needing a measurement history, with visibility of how it was produced.
- Intermediate complexity means it captures the main physical processes without requiring a full component-level specification. More than 20 parameters, five of them required, with defaults for the rest. Component-level modelling is available in DNV's SolarFarmer, a bankable energy-yield model used for design and financing. It is not an operational forecasting tool.
- Empirically refined means that where production history exists, tuning does two things: it estimates uncertain parameters such as ground cover ratio, tracker behaviour and terrain slope from measured output, then removes the systematic error that remains.
Tuning works because the parameters it estimates are those most often uncertain or undocumented for an operating plant. The model was designed around two realities: forecasting customers frequently lack detailed plant information, and operating conditions frequently differ from design specifications.
Figure 4 shows the result: estimates against measured output, the distribution of error, and the error statistics before and after tuning.

The size of the gain depends on how closely the initial configuration matched the plant. Where specifications are complete and accurate, the untuned model starts closer to measured output and tuning has less to correct.
The results produced by our team are above, with the method documented here. You can run it yourself using the Solcast Python SDK, which walks through site setup and tuning step by step.
Two observations from Figure 4 carry over to the training discussion below.
Tuning removed the systematic bias and narrowed the error distribution. The untuned model ran 0.95 MW high on average. After tuning, mean bias was −0.02 MW and the standard deviation of error fell from 2.65 MW to 1.94 MW.
Error remained after tuning. The chart does not separate its causes, but irradiance and weather error are likely contributors because tuning changes the representation of the plant, not the weather forecast supplied to it.
What remains after tuning. Tuning removed the systematic bias and narrowed the error distribution, but it did not remove all error. Some of what remains comes from irradiance and weather error, which changes to the plant model cannot correct. Some comes from the tuned model itself: a fixed set of parameters cannot match generation under every condition. That latter gap is what training can address.
Advanced PV tuning is self-service through the Solcast Python SDK. Customers who want this work done for them use Premium PV, which DNV runs as a managed service.
3.2 Tuning at fleet scale
The Rooftop PV Power model addresses a different situation: thousands of systems, partial specifications, no supervisory control and data acquisition (SCADA) feed. It needs as little as capacity, and with capacity, azimuth, tilt if known and shading can be inferred it produces a usable forecast without tuning. It can be applied across a fleet without per-site setup. Figure 5 shows the effect of tuning at one rooftop system.

The untuned estimate rises and falls earlier than measured output and peaks lower, consistent with orientation and loss assumptions that differ from the installed system. Tuning aligns both timing and magnitude in both seasons.
The gains come from capturing shading from trees and buildings that changes through the year, resolving multiple or unknown array orientations, and correcting persistent underperformance. Some users get a measurable improvement from adjusting the efficiency factor alone.
We recommend rooftop operators consider tuning the model themselves. It can reduce cost, avoids the need for data-sharing agreements to transfer site measurements, and gives you direct control over the model. The Rooftop PV Tuning notebook is the starting point.
For large utility-scale assets we recommend Advanced PV or Premium PV instead.
3.3 Training a site model
The Premium PV Power model trains on your generation history rather than calibrating a description of your plant.
Three classes of input go in:
- Your generation history. What the plant produced, interval by interval.
- Satellite-derived irradiance and weather data. Global Horizontal Irradiance (GHI), Direct Normal Irradiance (DNI), Diffuse Horizontal Irradiance (DHI) and Global Tilted Irradiance (GTI), satellite cloud tracking and forecasting, air temperature and wind speed, satellite-derived albedo, and a dynamic site-specific snow-soiling loss derived from irradiance, temperature and precipitation.
- A site-specific weather ensemble. Rather than depending on one weather model, Premium ingests a wide range of global and regional numerical weather prediction (NWP) sources, downscales them to your site, and bias-corrects them against your site’s own record. Using many sources reduces sensitivity to the biases of any one.
DNV fits several model families against your production history and selects the best performer on measured accuracy, per site. A DNV forecasting specialist reviews the result before it goes live.
What training captures. Where your plant’s real behaviour departs from the physical model. The model specifies things like the temperature response in advance, and training corrects inaccuracies in those specified values. It also learns effects that are hard to specify at all, such as clipping behaviour, shading patterns and soiling, from the record of what your plant produced.
What you supply. Plant metadata, and at least 1 year of recent generation history with power, availability and curtailment recorded. A 1-year record captures seasonal changes in plant performance. Shorter records can be used, but may not produce the same improvement.
What DNV does. Prepares and quality-controls your data, trains and reviews the model before it goes live, and maintains it over time.
New plants. For a new plant, or where less production data is available, DNV can start with a physics-based forecast from the plant specifications and train the full model once enough data has accumulated.
If the plant changes materially, through repowering, a capacity change, module or inverter replacement or a new cleaning regime, let us know so the model can be reviewed. Part of its training history will no longer reflect how the plant operates.
3.4 Which model suits which situation
A fuller comparison of the two utility-scale models is in Advanced PV or Premium PV: a practical guide to choosing the right forecasting model.
Every operator carries some cost from forecast error. What differs is its size and how the forecast is used. A configured and tuned Advanced PV model suits teams with good plant specifications who want to control the model and align it with their own expected-power calculations. Premium PV suits two other situations. The first is an operator whose forecast error is settled in a market and who would prefer not to do resource data preparation, NWP sourcing and retraining in-house. The second is a team that already runs its own forecasting models and wants an independent, site-trained input to benchmark or blend with them. Premium PV is trained on the plant’s own generation with its own weather ensemble, so its errors are less correlated with those of general-purpose forecasts that are not trained on the site. That is what lets it add information to a blend.
4. Two approaches and their limits
Both are described in published research and come up in discussions with customers. Each rests on a reasonable premise and has a limitation worth understanding before adopting it.
4.1 Going straight from weather model to power
The approach: skip physical modelling, feed recent prediction output and years of production data into a single machine-learning model, which learns the mapping directly.
Machine learning is central to how a site-trained forecast works, so the question here is where the learning is applied.
The irradiance step already has better data. Solcast resolves cloud and aerosol at 1–2 km globally from geostationary weather satellite imagery and derives irradiance from it. Many years of satellite-derived irradiance therefore already exist for any site. Inferring local cloud behaviour from plant output instead, which also carries outages, curtailment and metering errors, substitutes an indirect signal for a direct one.
The data it requires is rare. The approach can work where a site has more than five years of clean, consistent, well-flagged production data. Records of that kind are rare; most operating records include the events described in section 2.
You cannot interrogate the result. When a fully empirical model produces a forecast that looks wrong, there is no intermediate quantity to check, such as modelled irradiance at the site, and no chain to trace. That makes an unexpected forecast harder to diagnose before a submission deadline, and the model harder to explain to anyone reviewing it.
Our approach applies machine learning to the plant-specific step, the conversion from observed and forecast conditions to output, built on physical modelling and satellite-derived weather observations.
4.2 Using live production data for intraday forecasting
Live production measurements can also be used to adjust a forecast over short time horizons. The approach compares the plant’s most recent measured output with the output expected from the current irradiance forecast. If production is lower or higher than expected, that difference can be used to adjust the forecast over the next few intervals.
This can improve very-short-term forecasts when recent conditions persist. However, the measurement describes conditions that have already reached the plant. It does not show cloud approaching the site, and plant-level events such as an outage, inverter trip or curtailment can be mistaken for a change in irradiance. Where satellite cloud tracking is available, we recommend it as the primary intraday signal, for two reasons:
- It can observe approaching cloud. Production changes only after cloud reaches the plant, whereas satellite imagery can observe the cloud field before arrival.
- It separates weather from plant behaviour. An unflagged outage, inverter trip or curtailment event can reduce measured output even when irradiance has not changed.
For the shortest forecast horizons, recent production measurements may still provide useful information alongside satellite-based forecasts. However, their value depends on reliable, high-frequency measurements and the ability to distinguish weather-driven changes from changes in plant availability.
5. Reading a probabilistic forecast
The techniques above improve how a model converts weather into power. None of them removes the uncertainty in the weather. A probabilistic forecast is how that residual uncertainty is expressed so you can act on it.
Instead of producing a single number, the model produces a distribution of plausible outcomes for each interval. P-levels are named points on that distribution. Premium PV outputs four of them on the Max plan, alongside the central forecast, using the probability-of-exceedance convention standard in renewables finance:
- P90 is the value generation has a 90% probability of exceeding. The lower, conservative estimate.
- P10 is the value generation has a 10% probability of exceeding. The higher estimate.
- P75 and P25 sit between them, for when P90 and P10 are too conservative or too ambitious for the exposure you are managing.
So P90 is lower than P10, and the P90-P10 band describes the spread of plausible outcomes. We state the convention explicitly because P-level labels are not read the same way in every forecasting and statistical context. Figure 6 shows why the range matters.

An operator nominating against the central value alone bids identically for both forecasts. The band makes the difference visible before the decision rather than after settlement.
Four steps apply when using the range:
- Read the range, not only the central value. A narrow band and a wide band are different operating situations even when the central value is identical.
- Establish your risk asymmetry. What does over-delivery cost relative to under-delivery under your regime? Under many imbalance regimes they are not symmetric.
- Choose the level that matches it. Where shortfall is penalized harder, a more conservative nomination protects against the more heavily penalized outcome.
- Revise the nomination as the range narrows. The band typically tightens between day-ahead and final submission as better information arrives.
The reliability of a band depends on the data the model was trained on, which returns to section 2. A model trained on unflagged curtailment produces a band centered on a systematically low estimate.
5.1 The central forecast is not a P50
A P50 is the median of the forecast distribution, and Premium PV does not return one. Its central forecast is optimized for overall accuracy, balancing mean absolute error, root mean square error and bias, which places it between the median and the mean. On a skewed interval, such as a morning when fog may clear or persist, the median and mean can differ substantially. Use the P-levels to bid to a defined risk appetite, and the central forecast when you want a single value with the best overall error and bias behavior.
6. Where to start with improving your PV forecasts
If you already have a Solcast model running, a low-cost first step is tuning it with data you already hold. The Python SDK covers both Advanced PV and Rooftop PV.
If you are about to send generation data to anyone, we recommend working through the table in section 2 first: timestamps, units, gaps and curtailment flags. Problems found at that stage are cheaper to correct than after a model has been trained on them, and the check is worth doing whether the model at the other end is ours or yours.
If you want to measure what a site-trained forecast would add, whether as your primary forecast or as an independent input with different sources of forecast error, a benchmark on your own generation history measures the difference. Speak with the team. We recommend bringing 1 year of generation history, with curtailment periods identified where possible.
If you are new to PV power forecasting, start with a free API account and irradiance data for your site. An understanding of the irradiance at your site underpins everything above.